Subfolders in "AREVA" Go Up 1 LevelGo Up 1 LevelUp 

This folder contains no subfolders.

 Documents in "AREVA" (21 - 38 of 39)
View items:  to     
Document NameSort items in descending order Object Created Object Last Modified  
NGNP Heat Transport Small Scale Testing - Review and Assessment of TDRM Identified Tests NGNP Heat Transport Small Scale Testing - Review and Assessment of TDRM Identified Tests
20004-017 (09/21/2009) Page 1 of 56 AREVA NP Inc., an AREVA and Siemens company Technical Data Recor...
(Properties)
5/14/12 8:47 AM 5/14/12 8:47 AM Send Document Link
NGNP Nuclear Heat Source System Boundaries and Interfaces.pdf NGNP Nuclear Heat Source System Boundaries and Interfaces.pdf
20004-015 (09/30/2008) Page 1 of 55 AREVA NP Inc., an AREVA and Siemens company Engineering Informat...
(Properties)
3/20/12 7:16 AM 3/20/12 7:16 AM Send Document Link
NGNP Plant Design Requirements Document Rev 1 NGNP Plant Design Requirements Document Rev 1
20004-015 (09/30/2008) PROPRIETARY Page 1 of 52 AREVA NP Inc., an AREVA and Siemens company Engineer...
(Properties)
4/11/12 7:00 AM 4/11/12 7:00 AM Send Document Link
NGNP Reactor Parametric Study NGNP Reactor Parametric Study
NGNP Reactor Parametric Study 12-9084392-000 AREVA NP Inc., An AREVA and Siemens Company Page 1 AREV...
(Properties)
4/17/12 8:21 AM 4/17/12 8:21 AM Send Document Link
NGNP Risk Evaluation of Major Components NGNP Risk Evaluation of Major Components
AREVA NP Inc., an AREVA and Siemens company Procedure 0412-59 AREVA NP Inc. NGNP Risk Evaluation of ...
(Properties)
4/10/12 1:38 PM 4/10/12 1:38 PM Send Document Link
NGNP TDRM Schedule and Cost Estimate.pdf NGNP TDRM Schedule and Cost Estimate.pdf
NGNP TDRM Schedule and Cost Estimate December 2008 Disclaimer This report was prepared as an account...
(Properties)
3/27/12 7:43 AM 3/27/12 7:43 AM Send Document Link
NGNP Technology Development Road Mapping Report NGNP Technology Development Road Mapping Report
(Properties)
10/13/09 7:49 AM 1/13/10 8:06 AM Send Document Link
NGNP Technology Development Road Mapping Report.pdf (3) NGNP Technology Development Road Mapping Report.pdf (3)
Page 1a NGNP Technology Development Road Mapping Report January 2009 Disclaimer This report was prep...
(Properties)
3/22/12 6:58 AM 3/22/12 6:59 AM Send Document Link
NGNP Technology Readiness Levels for 750C Conventional Steam Cycle Configuration.pdf NGNP Technology Readiness Levels for 750C Conventional Steam Cycle Configuration.pdf
DRAFT Doc. No. TDR-3001463-000 NGNP Technology Readiness Levels for 750°C Conventional Steam Cycle C...
(Properties)
3/27/12 7:47 AM 3/27/12 7:47 AM Send Document Link
NGNP with Hydrogen Production IHX and Secondary Heat Transport Loop Alternatives NGNP with Hydrogen Production IHX and Secondary Heat Transport Loop Alternatives
12-9076325-001, AREVA, Sam Bader, 4/22/2008
(Properties)
11/25/08 4:02 PM 5/28/09 3:18 PM Send Document Link
NGNP with Hydrogen Production Preconceptual Design Studies Report Executive Summary NGNP with Hydrogen Production Preconceptual Design Studies Report Executive Summary
12-9052076-001, AREVA, Sam Bader, 6/21/2007
(Properties)
11/25/08 3:56 PM 5/28/09 3:18 PM Send Document Link
NGNP with Hydrogen Production RPV and IHX Pressure Vessel Alternatives NGNP with Hydrogen Production RPV and IHX Pressure Vessel Alternatives
(Properties)
10/27/09 12:51 PM 1/27/10 4:11 PM Send Document Link
NGNP with Hydrogen Production RPV and IHX Pressure Vessel Alternatives.pdf NGNP with Hydrogen Production RPV and IHX Pressure Vessel Alternatives.pdf
AREVA NP Inc. NGNP with Hydrogen Production RPV and IHX Pressure Vessel Alternatives April 2008 BEA ...
(Properties)
3/8/12 7:51 AM 3/8/12 7:51 AM Send Document Link
Power Level Special Study Power Level Special Study
AREVA NP Inc. NGNP with Hydrogen Production Power Level Special Study April 2007 BEA Contract No. 00...
(Properties)
4/5/12 8:53 AM 4/5/12 8:53 AM Send Document Link
Primary and Secondary Cycle Concept Study Primary and Secondary Cycle Concept Study
AREVA NP Inc. NGNP with Hydrogen Production Primary and Secondary Cycle Concept Study BEA Contract N...
(Properties)
3/29/12 7:50 AM 3/29/12 7:50 AM Send Document Link
Project Quality Assurance Plan Project Quality Assurance Plan
(Properties)
4/27/12 7:52 AM 4/27/12 7:52 AM Send Document Link
Reactor Type Comparison Study Reactor Type Comparison Study
AREVA NP Reactor Type Comparison Study Document No. 12-9045308-000 Page 1 AREVA NP Inc. NGNP with Hy...
(Properties)
4/27/12 7:37 AM 4/27/12 7:37 AM Send Document Link
Work Plan for Heat Transport Small Scale Testing for Prismatic Block Work Plan for Heat Transport Small Scale Testing for Prismatic Block
(Properties)
4/17/12 8:35 AM 4/17/12 8:35 AM Send Document Link
<- Previous 20 Documents  Next 1 Documents ->
Please note that it is the responsibility of the individual making information available on this website to ensure that any applicable reviews/approvals have been obtained from the originating organization.
Copyright © 2011 Idaho National Laboratory