Subfolders in "AREVA" Go Up 1 LevelGo Up 1 LevelUp 

This folder contains no subfolders.

 Documents in "AREVA" (1 - 20 of 39)
View items:  to     
Document NameSort items in descending order Object Created Object Last Modified  
Hith Temperature Gas Reactor Component Test Facility Mission Needs and Requirements Hith Temperature Gas Reactor Component Test Facility Mission Needs and Requirements
(Properties)
4/5/12 8:01 AM 4/5/12 8:01 AM Send Document Link
Infrastructure Readiness Assessment for the NGNP.pdf Infrastructure Readiness Assessment for the NGNP.pdf
20004-018 (10/18/2010) Page 1 of 48 AREVA NP Inc. Technical Data Record Document No.: 12 - 9142633 -...
(Properties)
3/15/12 7:48 AM 3/15/12 7:49 AM Send Document Link
Key Pebble Bed Reactor Design Requirements.pdf Key Pebble Bed Reactor Design Requirements.pdf
20004-018 (10/18/2010) Page 1 of 30 AREVA NP Inc. Technical Data Record Document No.: 12 - 9152036 -...
(Properties)
3/22/12 7:02 AM 3/22/12 7:02 AM Send Document Link
NGNP - Design Data Needs for AREVA 750 Degree Celcuis Prismatic Reactor Concept.pdf NGNP - Design Data Needs for AREVA 750 Degree Celcuis Prismatic Reactor Concept.pdf
20004-017 (09/21/2009) PROPRIETARY Page 1 of 325 AREVA NP Inc., an AREVA and Siemens company Enginee...
(Properties)
3/20/12 7:44 AM 3/20/12 7:44 AM Send Document Link
NGNP Component Test Facility Conceptual Configuration, Cost, and Schedule Estimate NGNP Component Test Facility Conceptual Configuration, Cost, and Schedule Estimate
AREVA NP Inc., an AREVA and Siemens company Page 1 AREVA NP Inc. NGNP Component Test Facility Concep...
(Properties)
5/29/12 7:30 AM 5/29/12 7:30 AM Send Document Link
NGNP Component Test Facility Cost and Schedule Report NGNP Component Test Facility Cost and Schedule Report
(Properties)
5/14/12 8:44 AM 5/14/12 8:44 AM Send Document Link
NGNP Component Test Facility Test Loop Pre-Conceptual Design NGNP Component Test Facility Test Loop Pre-Conceptual Design
AREVA NP Inc. NGNP Component Test Facility Test Loop Pre-Conceptual Design December 2008 BEA Contrac...
(Properties)
4/11/12 7:07 AM 4/11/12 7:07 AM Send Document Link
NGNP Component Test Facility Test Loop Pre-Conceptual Design Executive Summary NGNP Component Test Facility Test Loop Pre-Conceptual Design Executive Summary
AREVA NP Inc. NGNP Component Test Facility Test Loop Pre-Conceptual Design Executive Summary Decembe...
(Properties)
4/11/12 7:03 AM 4/11/12 7:03 AM Send Document Link
NGNP Composites R&D Technical Issues Study NGNP Composites R&D Technical Issues Study
TDR-3000807-001, AREVA, Sam bader, 9/15/2008
(Properties)
11/25/08 4:05 PM 5/28/09 3:18 PM Send Document Link
NGNP Conceptual Design - Plant Design Duty Cycle NGNP Conceptual Design - Plant Design Duty Cycle
20004-015 (09/30/2008) PROPRIETARY Page 1 of 26 AREVA NP Inc., an AREVA and Siemens company Engineer...
(Properties)
6/22/10 9:51 AM 6/22/10 9:54 AM Send Document Link
NGNP Conceptual Design - Point Design.pdf NGNP Conceptual Design - Point Design.pdf
20004-015 (09/30/2008) PROPRIETARY Page 1 of 17 AREVA NP Inc., an AREVA and Siemens company Engineer...
(Properties)
3/27/12 8:00 AM 3/27/12 8:00 AM Send Document Link
NGNP Conceptual Design Baseline Document for Conventional Steam Cycle for Process Heat and Cogeneration.pdf NGNP Conceptual Design Baseline Document for Conventional Steam Cycle for Process Heat and Cogeneration.pdf
20004-015 (09/30/2008) Page 1 of 16 AREVA NP Inc., an AREVA and Siemens company Engineering Informat...
(Properties)
3/21/12 7:23 AM 3/21/12 7:23 AM Send Document Link
NGNP Conceptual Design DDN/PIRT Reconciliation NGNP Conceptual Design DDN/PIRT Reconciliation
20004-015 (09/30/2008) PROPRIETARY Page 1 of 194 AREVA NP Inc., an AREVA and Siemens company Technic...
(Properties)
8/13/09 9:34 AM 2/13/10 10:07 AM Send Document Link
NGNP Conceptual Design Power Level and Number of Loops Trade Study Plan.pdf NGNP Conceptual Design Power Level and Number of Loops Trade Study Plan.pdf
20004-015 (09/30/2008) Page 1 of 10 AREVA NP Inc., an AREVA and Siemens company Technical Data Recor...
(Properties)
3/20/12 7:21 AM 3/20/12 7:21 AM Send Document Link
NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration
(Properties)
4/5/12 7:44 AM 4/5/12 7:44 AM Send Document Link
NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration Revision 1 NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration Revision 1
NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration Document No....
(Properties)
5/14/12 7:38 AM 5/14/12 7:38 AM Send Document Link
NGNP Conceptual Design Studies Reactor Building Design, Containment Issues, and Embedment Effects NGNP Conceptual Design Studies Reactor Building Design, Containment Issues, and Embedment Effects
12-9088427-001, AREVA, Sam Bader, 9/15/2008
(Properties)
11/25/08 4:04 PM 5/28/09 3:18 PM Send Document Link
NGNP Conceptual Design Studies Work Plan NGNP Conceptual Design Studies Work Plan
DRAFTD Doc. No. PD-3001186-000 Page 1A NGNP Conceptual Design Studies Work Plan November 20, 2008 Di...
(Properties)
4/5/12 7:41 AM 4/5/12 7:41 AM Send Document Link
NGNP Fuel Design Special Study NGNP Fuel Design Special Study
NGNP Fuel Design Special Study 12-9077148-001 AREVA NP Inc., An AREVA and Siemens Company Page 1 of ...
(Properties)
5/14/12 8:29 AM 5/14/12 8:29 AM Send Document Link
NGNP Heat Transport Small Scale Testing - Loop Technical and Functional Requirements NGNP Heat Transport Small Scale Testing - Loop Technical and Functional Requirements
20004-017 (09/21/2009) Page 1 of 22 AREVA NP Inc., an AREVA and Siemens company Technical Data Recor...
(Properties)
5/29/12 7:41 AM 5/29/12 7:41 AM Send Document Link
  Next 19 Documents ->
Please note that it is the responsibility of the individual making information available on this website to ensure that any applicable reviews/approvals have been obtained from the originating organization.
Copyright © 2011 Idaho National Laboratory